Maintain Connection to Planning Area

Maintain Connection to Planning Area A workflow diagram generated by Archify. 01 / Prerequisite 02 / Connection entry 03 / Characteristics 04 / Key figures Prerequisite · Planning area and allocation group exist · Prerequisite Prerequisite Planning area and allocation group exist Open the activity · Global ATP → Product Allocations · Connection entry · Step 1 Open the activity Global ATP → Product Allocations Step 1 Choose New entries · Connection entry · Step 2 Choose New entries Step 2 Enter allocation data (F4) · Group, area, version, periods · Connection entry · Step 3 Enter allocation data (F4) Group, area, version, periods Step 3 Select the entry · Characteristics → New Entries · Connection entry · Step 4 Select the entry Characteristics → New Entries Step 4 Save · Connection entry · Step 8 Save Step 8 Choose a characteristic (F4) · Characteristic + info object · Characteristics · Step 5 Choose a characteristic (F4) Characteristic + info object Step 5 Key figures → New entries · Key figures · Step 6 Key figures → New entries Step 6 Enter a key figure · Key figure + info object · Key figures · Step 7 Enter a key figure Key figure + info object Step 7 Legend User UI Context / trace

Notes — recovery function and backup

  • • Recovery checkpoints: choose a small checkpoint interval — Demand Planning data inside the interval is lost on recovery.
  • • Updated product allocation assignments inside the interval can also be lost during a recovery.
  • • Repair assignments: Easy Access → Global ATP → Environment → Product Allocations → Repairs → Product Allocation Assignment Check.
  • • Backup: transfer data from the planning area to the InfoCube instead of checking directly against the planning area.